Search customers, addresses, serials…
Synced
TODAY 09/10/2026

FIELD TESTING

Enter final readings

The initial failed readings remain alongside this retest.

Final readings pass

Final readings

Check valve 1

6.4 psid

Pass · minimum 5.0 psid

Check valve 2

Closed tight

Pass

Relief opening

2.3 psid

Pass · minimum 2.0 psid

Before repair

MeasurementInitial failed reading
CV14.2 psid
CV2Closed tight
Relief opening1.6 psid

Repair recorded

CV1 cleaned; relief valve rebuilt with service kit. Final readings do not overwrite the initial test.