FIELD TESTING
Evidence · TR-9001
910 Tower Road · Tower Road Industrial
Criteria missingCurrent test
Device
Type II RP detector assembly · TR-9001
Result
Criteria review required
Tester / gauge
Ray Morgan / Watts TK-9A · G-8814
Site
910 Tower Road · Tower Road Industrial
Mainline · RP
Check valve 1
6.1 psid
Pass · minimum 5.0 psid
Check valve 2
Closed tight
Pass
Relief opening
2.4 psid
Pass · minimum 2.0 psid
Type II bypass · single check
Bypass check
1.5 psid
Evaluate against published template criteria.
Evidence
Customer signature
Per selected verified template; no unsupported waiver
Tester signature
Ray Morgan · current saved signature
Optional current-visit photo
Device / site photo
Attach evidence for TR-9001 at 910 Tower Road
Review before completion
The required criteria for this configuration have not been confirmed. Save the measurements for review; do not mark the inspection passing or file it.