Skip to content

Why this test has no form yet

A supported test without a published utility-and-assembly template can be completed, but Psid cannot produce its form. Detector and visual test entry is not built.

Maintained by Psid. Contact support about this guide.

The utility has no published template

Psid can fill Greenville Water reports for RP, DC, PVB and SVB, and Spartanburg Water and Easley Combined Utilities reports for RP, DC and PVB. Tests for other programs are still complete and permanent, with readings, repairs and results saved, but have no published form to render onto yet.

The filing queue, with completed tests grouped by utility and a group for tests with no template yet.
The filing queue, with completed tests grouped by utility and a group for tests with no template yet. Shown on a phone.
The queue groups by utility, so a test with no form is visibly waiting rather than quietly missing.

Detector and visual assemblies

You can save an RPDA, DCDA, Type II, AVB or air gap as a device, but Psid cannot start or complete a test for it. Greenville Water’s and Easley Combined Utilities’ forms have no bypass fields. Spartanburg Water’s form lists DCDA, but Psid does not capture its bypass readings. Keep detector and visual tests in the utility’s existing process until Psid supports both entry and a suitable form.

What you can do

  • File on paper or through the program’s own process, exactly as you do now.
  • For RP, DC, PVB and SVB without a matching template, keep recording tests in Psid; their results and next-due dates are saved even without a report PDF.
  • For detector and visual assemblies, save the device details in Psid and track the tests and due date outside Psid for now.
  • Tell us the program — that is what decides which template is built next.

Ask us

This opens your mail client with the questions already in it. Psid has no form here on purpose: a box that files into nothing is worse than no box.

Email us the program

Next